Description of terminal:
Quay No.: 14
Water depth alongside the quay: 6.5 m
Total area: 15 000 m²
Two specialized silos with total capacity: 13 000 t
Transport scheme: automobile transportation and railway
Cargo handling capacity: max. 550 000 tons per annum
Cement terminal
Project of cement handling terminal was implemented in cooperation with the large-scale producer of cement „CEMEX”. Construction of terminal was a necessary precondition for export of products made at the production unit of „CEMEX” in Latvia and for import of products made at other production units to the markets of the Baltic states. Terminal was commissioned in 2009. According to the cooperation conditions LSEZ JSC „Liepajas osta LM” provides the stevedoring services.
News
News archiveWeather report
| Date/Time | 2012-05-10 09:57:25 |
|---|---|
| Sunrise | 5:31 |
| Sunset | 21:34 |
| Daylight | 16h 3min |
| Temperature | 14.6° (seems like ---°) |
| Humidity | 72% |
| Wind speed | ---m/s |
| Wind direction | --- (---.-°) |
| Barometer | 1017.1hPa ↓ |
| Rain | 0.0mm (1h) / 0.0mm (24h) |



